Constructing a Sandbag Filling Station
Dimensions given are approximate and my be field modified to suit local materials and needs. Distance between bottom of traffic cone and bottom deck should be equal to 3/4 of the bag height. For added strength, lag screws may be used to attach 2 x 4's to 4 x 4 posts. To reduce lifting heights, bottom deck should be as high as possible.
Note: Make sure distance between lower
deck cone bottom is sufficient for sand bag height.
Hardware
- 8, 16, and 20 penny Nails
- Optional Hardware
- 4- 1/2" Lag Screws
Estimated Skilled Construction Time: 1.75 man hours